Saturday, November 21, 2009
Concrete Stain
Front Porch Poured
November 13, 2009 They came and poured our front porch today. It is colored concrete, stamped and stained. It is amazing how they can make it look. Should add a lot of character to the porch. I wanted a wrap around porch where I can put 2 white rocking chairs. Hopefully someday I will have time to just sit and relax! I will be posting a few pics of them pouring and stamping.
Retaining Wall
Saturday, November 7, 2009
Pheasant Hunter
My Contractor, Ryan
This is my contractor Ryan Johnson. I am really glad I chose Ryan to build our house. He is great. Here it is 7 am Sat morning and he is here sawcutting my house. He will go coach his boy's soccer game at 10. He background is in concrete. Monday I have to pick out the color of the concrete for my porch and patio, which they will pour next week since the weather is so good. Hopefully the wind won't be blowing.....
Sawcutting
Septic Tank
On November 6, 2009 they put in our septic tank. Here it is in all of its glory. Always wondered what a septic tank looked like- now you know.
Pouring the Floors
Today, November 6, 2009 they poured the floors of the house. It wasn't the best day to pour concrete as the wind blew, and I mean blew, ALL day! Needless to say the top dried too quick and cracked in several places. It wouldn't be a big deal but we were going to use the concrete floor in several areas to save the cost of tiling. They can sawcut the concrete into 12 inch tile like sqares, stain and polish and it looks just like tile. Oh well, what are you going to do.
Thursday, November 5, 2009
Power Line To House
Front Yard
Gravel Filling Under Flooring
Water Line Into House
Inside Footings Poured
Sunday, November 1, 2009
Foundation is Done!
Subscribe to:
Posts (Atom)
